top of page
Bridge and Lock Rehabilitation
2020
HPN Engineering
Scope
-
Refacing concrete wing walls and abutments, and replacing a 59 ft steel girder bridge.
-
Began this project with the role of general labourer, installing rebar and setting up concrete forms. After 3 months, promoted to foreman of the job site due to my strong ability to lead the team, interpret engineering drawings, and problem-solve when errors arose.
Skills
-
Problem-solving
-
Team leadership
-
Interpreting engineering drawings
-
Attention-to-detail
bottom of page











