Swing Bridge Removal
2021
HPN Engineering
Scope
-
Removing a 136 ft swing bridge over a frozen river.
-
Devised the process to jack up the bridge and lower it onto barges, where it was then floated 2,000 ft down a frozen river.
-
As foreman, coordinated 12 tradesmen, general labourers and millwrights, to carry out daily operations.
-
Interpreted engineering drawings to determine how to build concrete forms.
-
Learned important hands-on skills and gained experience in looking at projects from an engineering perspective.
Skills
-
Problem-solving
-
Attention-to-detail
-
Team coordination
-
Interpreting engineering drawings